Phase # 2 Statistics
Total Quantities of Phase # 2
(TP2/3: Structure, Services, FIT-OUT and External Works)
Structural Works
| Reinforced concrete for total project |
80,000 m3 |
| Library slab shuttering |
85,000 m2
|
| Steel reinforcement for total project |
18,000 tons |
Finishing Works
| Blockwork |
30,800 m2 |
| Paint |
55,000 m2 |
| Wood parquet |
20,500 m2 |
| External
granite flooring |
6530 m2 |
| Internal granite flooring |
2850 m2 |
| Stairs granite |
1646 m2 |
| External granite flooring (Plaza) |
13,148 m2 |
| Linoleum flooring |
8,100 m2 |
| Epoxy flooring paint |
18,700 m2 |
| Reflection pool ceramic tiles |
4,500 m2 |
| Total flooring |
35,364 m2 |
| Ceramic tiles installation |
8,000 m2 |
| Wall cladding – Zimbabwe black granite |
3,500 m2 |
| Wall cladding panels – wood |
9,500 m2 |
| Wall cladding panels – metal (plastic
zed) |
3,150 m2 |
| Wall cladding panels – copper |
1,232 m2 |
| Wall cladding panels – Stainless steel |
65 m2 |
| Wall cladding panels – aluminum |
1,464 m2 |
| Wall cladding panels – glazed |
1,879 m2 |
| Pre-cast wall cladding |
2,800 m2 |
| Total cladding panels |
17,680 |
| Partitions (various types) |
34,660 m2 |
| Suspended ceilings installation (various)
|
32,400 m2 |
| Fire-rated doors (steel & veneer) |
1,000 m2 |
| Balustrades |
3,399 m2 |
M&E Works
| Air handling Units AHU |
82 |
| Chillers and cooling towers |
4 |
| Refrigeration |
650 tons |
| Network of insulated pipes |
5,500,000 m |
| Smoke/Exhaust fans |
39 |
| Ducts |
635 tons |
| Fire protection pipes |
35,000 m |
| Fire alarm system |
2500 |
| Fire alarms (manual) |
100 |
| Water pump (1000 gal/min) |
2 |
| Spray nozzles |
13,000 |
| Fire fighting network |
4,500,000 m |
| Plumbing, drainage and water service pipes
|
3,900 m |
| Pipe, stainless steel, for roof cleaning
|
750 m |
| MV and LV power cables |
34,260 m |
| Dewatering wells |
11 |
| Earthing and lightning protection |
1 |
| Building Maintenance System panels |
67 |
| Security system devices |
964 |
| Speakers |
2,395 |
| CCTV Cameras |
120 |
| BMS monitors |
30 |
| Telephones – external lines |
120 |
| Telephone system – internal lines |
800 |
| Reception antennas-VHF/UHF/Sat. dishes |
5 |
| Generators, 1500 KVA and 300 KVA |
2 |
| Fiber optic cables for Information System
|
8,400 m |
| Switch covers for Information System |
30 |
| Light fixtures |
22,000 |
| Elevators for passengers, freight |
16 |
| Electrically operated doors |
145 |
Specialist Sub-Contractors
| Roof cladding |
18,000 m2
|
| External wall cladding |
6,000 m2 |
| Curtain walling |
5,300 m2 |
| Planetarium |
1 |
Phase